The course team has continued to strip the 12th fairway this week
to reuse this turf on thin/worn/damaged parts of other fairways around the
course. This week we turfed over the recent drainage behind the 6th
green and sections on the 13th fairway near the green. Whilst this
method is more labor intensive than unloading it from a pallet supplied from the turf farm, it
is a cost saving and the turf will blend into these fairway areas quicker as it
is already being mown at the correct height.
Pigment has been applied to all tee pads this week to provide a color
contrast to the tee surrounds. The recent herbicide applications for winter
grass in the tee complexes were concentrated mainly on the surrounds, as it was
anticipated that the herbicide used would send the turf into an earlier
dormancy. A different herbicide has been applied this week to control winter
grass weeds in collars, aprons and bunker surrounds on holes 11, 13, 16, and
the chipping green. Maintaining adequate soil moisture for 14 days following
the application of this herbicide is essential to achieve effective weed
control. To ensure this, staff will hand-water the treated areas as needed
during this period.
The colder nights and mornings this week have certainly made it feel like
winter, with frost present on Wednesday and Thursday mornings. The deciduous
trees continue to make a mess of the course but the vacuum and tow behind
blower have been busy towards the end of the week, working in unison by blowing
the leaf debris out from under the tree canopies towards the fairways so that
the vacuum is able to pick it up much quicker without the hassle of driving in
and out of the trees.
The 19th green continues to improve each week despite the
challenge of the colder weather. A bird deterrent has been installed to keep
the ducks off this surface in a nice way. A sensor in this device detects the
ducks and emits a variable ultrasonic frequency to deter the ducks without
harming them. Sand will be added to the bunkers on this hole over the next week
with depths checked to ensure proper coverage over the lining. The block wall
around the pipe at the top of the pond has been constructed this week, with
backfilling and turfing to complete this area.
The volunteers were on course Monday morning completing a
bunker run in front of the competition players, cleaning/trimming drainage
pits, checking the practice nets and poisoning Crabgrass in tee complexes.
Thank you to everyone that attended this week to assist with the maintenance of
the course. Your help is always much appreciated and valued by the course team.
Greens will be cut both mornings this weekend and I will be setting the pins on Saturday and Sunday.
Happy Golfing